Tuesday, April 28, 2009

Monday, April 28, 2009

ISEA floating docks are repaired by Seeco Contracting - Thanks Bob, Adam and Jim.
We still have several seasonal slips for rent.

42 degree water is no problem for Adam and Jim.


Re-rigging continues on Inland Seas. We anchored the vessel in Suttons Bay so we could raise the sails into the wind and lash on the mast hoops. This went well until the wind got over 30 knots (34 kt. max) and we bagged it. Got all by two hoops done. Above photo shows Allen and Rebecca lashing the hoops to the mainsail.Mast hoop lashing.

-TK

No comments:

Post a Comment