Saturday, April 12, 2014

Schoolship Inland Seas Fit-Out Underway at Northport Bay Boat Yard

Lower "skirt" cover added to allow work on the bottom

Inside the lower cover, ready for sand blasting off the old paint

Capt. Ben fairing out a repaired area of the Pilot House roof

Control for the new inverter/charger.  We also replaced a VHF radio, radar, GPS plotter and added an isolation transformer this winter.
More photos from fit-out coming soon.  We hope to launch as soon as we have open water.  The Bay is still completely frozen, except for a few places around the edges. -Capt. Tom

No comments:

Post a Comment