Schoolship
Inland Seas Fit-Out Underway at
Northport Bay Boat Yard
 |
Lower "skirt" cover added to allow work on the bottom |
 |
Inside the lower cover, ready for sand blasting off the old paint |
 |
Capt. Ben fairing out a repaired area of the Pilot House roof |
 |
Control for the new inverter/charger. We also replaced a VHF radio, radar, GPS plotter and added an isolation transformer this winter. |
More photos from fit-out coming soon. We hope to launch as soon as we have open water. The Bay is still completely frozen, except for a few places around the edges. -Capt. Tom